New periodic inspection certification process

Are you an installation company?

If you are an installation company and wish to register a periodic inspection, click here to request your username or open the form:
Registration and access to the form

How do I subscribe using the form?

We guide you through the registration process.

Download the guide in PDF

To report a regular inspection of an installation supplied from a piped network of liquefied petroleum gas (LPG)

To report a regular inspection of an installation supplied from a piped network of liquefied petroleum gas (LPG):

Send an email to: inspeccionperiodicaGLP@gasnaturalfenosa.com

Please note that your email must include all the following information:

  • Full address of the supply point (province, city or town, address, number, annexe, floor nº, door nº, etc.)
  • Company code
  • Tax ID No.(NIF)/Foreigner ID No.(NIE)
  • Company name
  • Full address of the installation company (province, city or town, address, number, annexe, floor nº, door nº, etc.)
  • Installer’s code
  • Installer’s National/foreign-resident tax ID nº
  • Installer’s name
  • Installer’s email address
  • Inspection results
  • Effective rated output
  • Supply situation
  • Inspection date
  • Cost of periodic inspection, including VAT
  • Bank account number (full IBAN number)
  • Comments

You must also attach a copy of the certificate for the regular inspection carried out and the invoice issued, as the inspection cannot be processed without these.

regular inspection

Call free on

900 100 252

New regulations

 

Pursuant to current legislation, the new Royal Decree 984/2015, of 30 October, which you can find on our website, a Regular Inspection must be performed every 5 years. The distribution company (Nedgia) must inform its customers by letter regarding this process, notifying them of their option to select a qualified gas installation company to conduct the inspection of their installation.

If the customer wishes an installation company to conduct the inspection, they will be required to contact said company within the deadline indicated in the letter. The installation company shall be responsible for informing Nedgia of completion and the result of the inspection.

The regulations state that distribution companies are required to inform users connected to their network, with at least three months prior notice, about the need to conduct a periodic inspection of shared reception installations and/or individual installations at the supply points connected to their networks. If Nedgia has not received the corresponding inspection certificate within the deadline, it shall be considered that the customer has not completed the inspection with an installation company and the inspection will therefore be conducted by the distribution company.

Royal Decree 984/2015