These actions are the main ones on existing connections for repairs or modifications in Community Receiver Installations (CRIs). For example, due to works in the building, repair for stem leakage or closing and reopening of the connection.
Main actions involved in connections
Connection of new stem and / or replacement of service valve
Renewal of the connection due to replacement, repair or total or partial displacement of the CRI and which includes the placement of a new stem that must be connected to the network. This new stem must be less than 50 cm away cm from the existing one, otherwise it will be considered a new connection construction plus the cancelling of the existing one.
New connection construction
Connection action for the construction of a new connection due to the installation of a new IRC stem more than 50 cm from the existing one, this action will have to be combined with the action to cancel the existing connection.
Connection of new stem and / or replacement of service valve
Renewal of the connection due to replacement, repair or total or partial displacement of the CRI and which includes the placement of a new stem that must be connected to the network. This new stem must be less than 50 cm away cm from the existing one, otherwise it will be considered a new connection construction plus the cancelling of the existing one.
New connection construction
Connection action for the construction of a new connection due to the installation of a new IRC stem more than 50 cm from the existing one, this action will have to be combined with the action to cancel the existing connection.
Cancelling of existing connection
Connection to eliminate the distributor installation once the supply has ceased. The existing connection from the network or the closest part to the connection valve will be cancelled.
Reopening of connection due to programmed closure
Action to close the connection to undertake a repair or modification of the CRI that does not modify the stem, or other reasons that may be necessary, and its subsequent reopening and inspection of the installation. The day and time of opening and closure should be programmed.
Cancelling of existing connection
Connection to eliminate the distributor installation once the supply has ceased. The existing connection from the network or the closest part to the connection valve will be cancelled.
Reopening of connection due to programmed closure
Action to close the connection to undertake a repair or modification of the CRI that does not modify the stem, or other reasons that may be necessary, and its subsequent reopening and inspection of the installation. The day and time of opening and closure should be programmed.
Pricing information for actions involved.
Authorised installers information
› Check the list of installers authorised to carry out actions on existing connections